# House Hacking in Fremont (94536): Two rail lines at the rebuilt Centerville depot · The Rent Hacker

> Fremont 94536 for house hackers: Centerville Plaza (290 affordable units plus retail) funded with Phase 1 imminent, in-ZIP Capitol Corridor and ACE at the reb

Canonical: https://therenthacker.com/house-hacking/fremont-centerville-94536/
Source: The Rent Hacker (https://therenthacker.com/). License: RSL, attribution required — https://therenthacker.com/license.xml

---

[East Bay guide](/house-hacking/east-bay/) · Tier A · Rank #18 of 87

# House hacking in Fremont (Centerville / Niles).

Centerville Plaza (290 affordable units plus retail) funded with Phase 1 imminent, in-ZIP Capitol Corridor and ACE at the rebuilt depot, and Fremont's TOD overlay. The catch is the ~$1.6M Fremont basis.

## What's actually happening in 94536

-   Funded / imminent
    
    Centerville Plaza (290 affordable units plus retail): funded, Phase 1 targeted ~June 2026. [The Real Deal](https://therealdeal.com/san-francisco/2026/05/21/usa-properties-fund-buys-fremont-development-site/)
    
-   Operational
    
    In-ZIP Capitol Corridor and ACE at the rebuilt Centerville depot; Fremont BART about 2 miles out. Capitol Corridor / ACE
    
-   Under construction / adopted
    
    Centerville Complete Streets under construction; the Fremont TOD overlay was adopted Dec 2023. City of Fremont
    
-   Existing anchors
    
    Washington Hospital plus the Tesla employment shed. City of Fremont
    

## The numbers

Median price

~$1.6M (Fremont)

Market rent

Fremont $2,818/mo (Zumper; +2.3% YoY)

Property tax (Alameda County)

~1.25% effective (Fremont)

Per-bed rent band

$1,100–1,400/mo per bed

ADU rent band

$2,200–2,800/mo

Whole-home rent band

2bd $3,086 / 3bd $3,755 whole-home

Underwriting vacancy

4% underwriting vacancy

Appreciation scenarios

1.0 / 2.5 / 3.5 %/yr (conservative / base / upside)

The basis is the constraint here, and the catalysts are real. Appreciation basis: The $1.6M basis caps the play at SFH-ADU; low-to-mid capex. Rent bands are city-level medians; confirm the specific parcel before trusting any of them. [Run your own scenario in the calculator](/calculator/).

## Buildings we underwrote in 94536

1 building in 94536 carry a record. 0 beat renting and index funds; the rest did not. Every row links to its own page, with the numbers it was scored on.

Property

At our defaults

Status

[37167 Mission Blvd](/property/rh-2h3qld/37167-mission-blvd/) 1 unit · $1,199,000

−$1,023,025 S&P 500

Underwritten — the index wins at our defaults

The full [board](/board/) shows every region's current week; this table is every record we hold for 94536, newest basis first.

## The house-hack angle

SFH-with-ADU only at this basis: room and small-multifamily economics don't pencil for a 3–10% down buyer at ~$1.6M.

## What breaks it

-   The ~$1.6M basis is the affordability flag that held this ZIP at A
-   Fremont comps printed -2.2% YoY: negotiate, and don't underwrite appreciation
-   City-proxy rents: re-comp at the property level

This page is the standing analysis. The weekly part, actual Fremont-area listings that pass the math, lands on the East Bay board every Wednesday.

[This week's East Bay board](/board/sf-east-bay/)

[This week's East Bay board](/board/sf-east-bay/) · [Read past East Bay issues](/issues/sf-east-bay/) · [Every pick, on the record](/track-record/) · [How a deal becomes a pick](/methodology/)

Data synthesized 2026-07-04, catalysts re-verified 2026-07-15. Mortgage-rate basis: 6.43% (Freddie Mac PMMS, week of 2026-07-02). Sources are the public planning documents and market listings named above, fetched on the synthesis date. Nothing here is investment advice; every deal needs a bindable insurance quote and parcel-level verification.
